Consumer Commission Quashes Rs 2.10 Lakh Power Bill Issued to Kupwara Man Over Family’s Old Dues

   

SRINAGAR: The District Consumer Disputes Redressal Commission, Kupwara, has quashed an electricity bill of Rs 2,10,934 issued to a Drugmulla resident over outstanding dues linked to his former joint family house, directing the Kashmir Power Distribution Corporation Limited (KPDCL) to issue a fresh bill for his newly constructed residence and pay Rs 10,000 as litigation charges.

Follow Us OnG-News | Whatsapp
Power Bill (Rep)

The commission further directed KPDCL to comply with the order within two weeks of receiving a copy of it.

According to The Times of India, the commission, comprising president Peerzada Qousar Hussain and member Nyla Yaseen, partly allowed a complaint filed by Ghulam Nabi Magray on May 29, 2025, against the executive engineer, KPDCL, Handwara division.

The complaint alleged that the power distribution corporation had transferred outstanding dues from his former jointly owned family house to his newly constructed residence instead of issuing an independent electricity bill.

Magray had lived with his three brothers in a joint family house before separating from the family in 1987 and moving outside the Valley. As the head of the joint family, the electricity connection for the shared house was registered in his name under Consumer ID No. 0214010006915.

He later constructed a separate house and started residing there, although he continued to remain outside Kashmir for more than six months a year.

The complainant alleged that KPDCL continued generating bills in his name by transferring the outstanding dues of the former family residence to his new house. He also claimed that electricity bills were raised despite the absence of basic infrastructure, including electric poles and low-tension (LT) distribution lines near the premises.

The outstanding amount had reached Rs 2,10,934 by March 2025, the complaint stated.

Magray further submitted that he had repeatedly approached the department for correction of the bills but his requests went unheeded. He had also approached the deputy commissioner in 2018, following which his representation was forwarded to the executive engineer concerned.

As reported by The Times of India, Magray had sought Rs 3 lakh in compensation for allegedly incorrect billing, along with 10 per cent interest, Rs 1 lakh for mental agony and Rs 50,000 towards litigation expenses.

KPDCL appeared before the commission through its counsel after receiving notice but failed to submit its written response within the stipulated period. The commission subsequently closed its right to file a reply.

In its order, the commission observed that Magray had approached the department after constructing his new house and sought correction of electricity bills that continued to be generated in his name against the pre-existing jointly owned family property.

It held that KPDCL was duty-bound to rectify the billing particulars and issue bills in the name of the proper subscriber of the jointly owned house rather than continuing to generate them in Magray’s name.

“Not rectifying the particulars of the electricity bills has accumulated the amount and has admittedly caused inconvenience to the complainant. Such inaction of the OP amounts to deficiency in service on the part of the OP,” the commission observed.

The commission accordingly quashed electricity bill No. 0214010006915, amounting to Rs 2,10,934, issued in Magray’s name.

It directed KPDCL to issue a fresh electricity bill for his newly constructed house, provided the premises have an electricity connection.

However, the commission clarified that Magray would remain liable to pay the outstanding dues pertaining to the jointly owned family house. It also directed the corporation to pay him Rs 10,000 as litigation charges within the stipulated compliance period.