Power Shutdown In Kashmir Parts

0

SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out routine maintenance and cutting of trees/branches, the shutdown of 220KV D/C Delina Sterlite TL Ckt-I shall be observed on October 27 from 9 am to 5 pm.

Sponsored

Sponsored

Similarly, for the same purposes shutdown of 220KV D/C Delina Sterlite TL Ckt-II shall be observed on October 28 from 9 am to 5 pm.

_

About Author

Leave A Reply