SRINAGAR: The Jammu Kashmir and Ladakh High Court has dismissed a petition filed by former Jammu Development Authority (JDA) officials challenging corruption charges over the alleged illegal allotment of a Rs 40.83-lakh renovation contract without inviting tenders, observing that awarding public works without open competition amounted to a prima facie case of “favouritism and nepotism”.

Follow Us OnG-News | Whatsapp

Justice Sanjay Dhar, while dismissing the petition on November 19, held that public servants who misuse their official positions to confer pecuniary benefits on third parties can face prosecution under the Jammu and Kashmir Prevention of Corruption Act, even if the alleged benefit was not obtained by the officials themselves.

“The actions of public servants while dealing in such matters have to be in conformity with standards and norms which are not arbitrary, irrational or irrelevant,” the court observed, adding that the officials were legally obliged to invite open competition from eligible contractors before awarding the contract.

The court refused to interfere with the charge sheet arising from FIR No. 10 of 2020 registered by the Anti-Corruption Bureau (ACB), Jammu, under Section 5(1)(d) read with Section 5(2) of the J&K Prevention of Corruption Act and Section 120-B of the Ranbir Penal Code (RPC). It also declined to set aside the order dated April 9, 2025, of the Special Judge Anti-Corruption, Jammu, framing charges against the petitioners.

The case concerns the allotment of renovation and interior works, including air-conditioning and allied electrical works, at the ground floor of the JDA Office Complex at Vikas Bhawan, Rail Head Complex, Jammu, during 2011.

According to the prosecution, petitioner No. 2, who was then serving as Vice-Chairman of the JDA, had initially approved the installation of 10 two-tonne air-conditioners and allied electrical works through a tendering process. The Executive Engineer subsequently invited tenders, in which M/s Lumen Engineers emerged as the lowest bidder (L1).

However, instead of awarding the contract to the lowest bidder, the tender was cancelled on April 8, 2011, allegedly on verbal directions of the then Vice-Chairman. The participating bidders were informed of the decision and their earnest money instruments were returned.

The investigation further revealed that the scope of the original work was subsequently expanded to include renovation and interior works, besides installation of air-conditioners, without initiating a fresh tendering process.

The ACB alleged that the decision was taken by the then Vice-Chairman in conspiracy with the then Executive Engineer, petitioner No. 1, and the then Superintending Engineer, T. R. Salgotra, who has since died, to confer undue benefits on petitioner No. 3.

The contract was eventually awarded to petitioner No. 3 on a nomination basis through an agreement executed on June 3, 2011, for Rs 40.83 lakh. The ACB also alleged that the contractor’s licence had expired at the relevant time, yet the firm executed the electrical, renovation and interior works and received Rs 40.53 lakh in payment.

The ACB’s Engineering Wing initially assessed the loss to the State exchequer at Rs 2,12,295. Following a subsequent inspection on October 5, 2021, and scrutiny of the records and the petitioners’ response, the amount was revised to Rs 1,46,828 after deducting Rs 9,600 towards transportation and installation charges for the air-conditioners.

Challenging the prosecution, the petitioners argued that the investigating agency had examined all 44 contracting items but could establish alleged financial loss only in respect of three. They questioned the methodology adopted for calculating the loss, contending that the ACB had relied on the CPWD Book of Analysis Rates of 2010, which they described as a reprint of the 2007 edition, instead of the CPWD Schedule of Rates for 2012.

According to the petitioners, applying the 2012 rates, which reflected prevailing market prices during the period when the work was executed between April and September 2011, would have shown that no loss had been caused to the State exchequer.

They also argued that the ACB had failed to account for the labour component involved in fixing floor tiles while calculating the alleged loss. Merely not inviting tenders, they submitted, could not constitute criminal misconduct in the absence of financial loss to the Government.

The petitioners further maintained that the work was specialised in nature and required skilled manpower and infrastructure. They argued that petitioner No. 3 was an experienced entity empanelled with Jammu and Kashmir Bank Limited and had executed the JDA work at the same rates used for renovating the bank’s Shalimar Road branch.

Opposing the petition, Additional Advocate General Raman Sharma, assisted by Advocate Saliqa Sheikh, submitted that the work was neither highly technical nor so specialised that only petitioner No. 3 could execute it.

The investigating agency maintained that the contract had been awarded through a premeditated decision by the officials and that public servants could not bypass prescribed rules and procedures on the basis of presumptions. It defended its assessment of the financial loss, stating that the calculations were based on standard engineering indices and valuation practices.

The ACB also argued that the petitioners’ claim of financial savings relied on incorrect comparisons and that the mean of the rates mentioned in the CPWD schedules for 2010 and 2012 had been adopted as a reasonable method where exact rates for the relevant period were unavailable.

After examining the rival submissions, Justice Dhar held that the admitted cancellation of the original tender and subsequent allotment of the expanded work to petitioner No. 3 without inviting fresh tenders provided sufficient material at this stage to proceed against the accused.

Rejecting the argument that the work was too specialised for open competition, the court observed that renovation of an office complex and installation of air-conditioning systems did not require such highly technical expertise that only one contractor could undertake the work.

“Any contractor who has experience and license in conducting such types of work would be eligible to execute it,” the court observed.

The judge further held that the offence of criminal misconduct under Section 5(1)(d) of the J&K Prevention of Corruption Act was not confined to cases where a public servant obtained a financial advantage for himself. The provision also covered situations in which an official abused his position to secure a valuable thing or pecuniary advantage for another person.

“A public servant who causes wrongful loss to the Government by benefiting a third party would expose himself to be tried for offence falling within the definition of Section 5(1)(d) of the PC Act,” the court held.

In reaching this conclusion, the court relied on the Supreme Court’s judgment in Neera Yadav v. CBI, (2017) 8 SCC 757, which interpreted the corresponding provision of the Central Prevention of Corruption Act. The Supreme Court had also described nepotism in the distribution of official favours as a particularly harmful form of corruption.

The High Court also rejected the petitioners’ attempt to have the alleged financial loss reassessed at the stage of challenging the framing of charges.

 

Referring to the Supreme Court judgments in Sajjan Kumar v. CBI (2010) and Amit Kapoor v. Ramesh Chander (2012), the court reiterated that a High Court cannot conduct a mini-trial or undertake a detailed assessment of evidence while examining an order framing charges.

It observed that the question of whether the CPWD Schedule of Rates for 2012 or the average of the rates for 2010 and 2012 should be applied to calculate the alleged loss could be determined only after the engineering experts of the investigating agency appeared before the trial court and faced cross-examination.

“The Court is not an expert to decide as to what rates are required to be applied while calculating the loss to the State exchequer,” Justice Dhar observed.

The court held that the material collected by the investigating agency, when taken at face value, was sufficient to show that the alleged loss had resulted from the award of the contract without following the prescribed procedures.

“At this stage, the material placed on record by the investigating agency along with the charge sheet has to be taken at its face value,” the judgment stated, adding that the charges could not be described as groundless.

Senior Advocate Rahul Pant, assisted by Advocate Aniruddh Sharma, appeared for the petitioners, while Additional Advocate General Raman Sharma, assisted by Advocate Saliqa Sheikh, represented the Union Territory of Jammu and Kashmir.

The petition, CRM(M) No. 399/2025, had been reserved for judgment on October 31, 2026, and was pronounced on November 19, 2026. The full judgment was uploaded on November 20.

The court ultimately dismissed the petition, allowing the corruption proceedings against the officials to continue before the trial court. The dismissal does not determine their guilt, which remains to be established in the trial.