Srinagar
According to Power Controller Kashmir, the 132 KV D/C Pampore-Rawalpora Transmission line will be shut down from April 22, 2019, to April 28, 2019, to facilitate erection/shifting of tower locations at Ch No. 277+000 near Galander Pampore Bridge.
Therefore, power supply to the areas fed from the line shall remain affected on the said dates.