
Over 95% Power Supply Restored In Kashmir: Div Com Kashmir
SRINAGAR: Against the target of 22000 kilometres, as many as 18000-kilometre road length was cleared…
SRINAGAR: Against the target of 22000 kilometres, as many as 18000-kilometre road length was cleared…
SRINAGAR: According to the Power Controller, Kashmir Province, in order to stringing work 33kv Baramulla…
SRINAGAR: According to the Power Controller, Kashmir Province, in order to carry out segregation of…
SRINAGAR: According to the Power Controller, Kashmir Province, in order to replace GOAB switch with…
SRINAGAR: According to the Superintending Engineer, Operation and Maintenance Circle-Ist, KPDCL Srinagar, in connection with…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out shifting…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out necessary…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out work…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out stabilization…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out stabilization…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out thickening/twining…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, shutdown of 33KV Chadoora-Nagam line shall…
SRINAGAR: According to the Power Controller, Kashmir Province, Bemina Srinagar, in order to carry out…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out branch…
SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to energize the repaired…