SRINAGAR: According to the Power Controller, Kashmir Province, in order to carry out work of cutting down some poplar trees along the corridor of 33kV Harnag Tap Line, the 33kv Wanpoh Sarnal line shall remain shut on July 22 from 9 am to 3 pm.

The power supply to Harnag, Nai Basti, Sarnal and Akura Receiving Stations shall remain affected on the said date.

Similarly, in order to carry out chopping of poplar trees in the corridor of Rawalpora-Air Force and Rawalpora-Rangreth Lines and also to carry out reconductoring of Pampore-BK Pora Line, the power supply from 33kv line of Rawalpora-Rangreth and Rawalpora-Airforce to Rangreth, Doodh Ganga water supply, JAKLI Receiving stations shall remain affected on July 22 from 1 pm to 4 pm.

Likewise, power supply from 33kv Pampore-BK pora lines to Receiving Station B K Pora Khandah shall remain off on July 22 and July 25 from 9 am to 5 pm.

Also, power supply from 33kv line Pampore-Chadoora to Receiving Station Chadoora Ichgaam shall remain off on July 22 and July 25 from 9 am to 10 am and 4 pm to 5 pm respectively.

As per a separate notice, Power Controller, Kashmir province, has notified that in order to carry out construction/erection of 33kV Line for GCET Safapora, the 33kV Army/HCC Bandipora line shall remain shut.

The power supply to Receiving Stations Ajas Nadihal/Preng shall remain affected on July 22 from 10 am to 6 pm.

LEAVE A REPLY

Please enter your comment!
Please enter your name here