SRINAGAR: According to the Superintending Engineer O&M, Circle II, KPDCL Srinagar, in order to execute the ongoing DDUGJY and PMDP works in Budgam Town, the shutdown of 11 KV Feeder No. 2 of SIDCO Receiving Station Budgam shall be observed on September 02 from 9 am to 3 pm.

To carry out the works related to the ongoing DDUGJY and PMDP works in district Budgam, the shutdown of 11 KV Satellite Feeder No.3 of Receiving Station Chrari shall be observed on September 02, 05 and 07 from 9 am to 3 pm.

Similarly, to carry out pole erection in Sharik Colony, Drabo Station, Store Station, S K Colony, Sofi Station, Ibrahim Colony, Shakoor Colony and Sheikh Mohalla Section, a shutdown of 11 KV Feeder No. 1of Receiving station Bemina-Ist shall be observed on September 04, 07 and 09 from 9 am to 1 pm.

According to the Power Controller Kashmir Province, Bemina Srinagar, in order to carry out the installation of Spared 11kV Panel set, the shutdown of 33/11 kV Rajbagh Receiving Station shall be observed on September 03 from 9 am to 2 pm.

Similarly, to carry out the replacement of faulty 33 kV XLPE cable of 33 kV Nishat line, Shut down of 33 kV Receiving Station Centaur, Buchwara fed from 33 kV CheshmaShahi Centaur line, Receiving Stations Brein, Nishat, Dulband (PHE) fed from 33 kV Cheshmashahi Nishat line and Receiving Stations Shalimar, Harwan fed from 33 kV Cheshmashahi Shalimar line shall be observed on September 02 from 11 am to 2 pm.

LEAVE A REPLY

Please enter your comment!
Please enter your name here